February is Work Party month

Published 00:00 on 8 Feb 2025

The work parties are a great way for you to support the club, you get a chance to meet other members you might not normally see, plus you also get a free lunch! 

Work Parties take place on Sunday 16th and Sunday 23rd February 2025 starting at 10am. There is no sailing on these two Sundays.  

Following the format of previous years, the list of jobs has been pulled together by the Facilities sub-committee along with suggestions from members.


Please find below a summary of the list of jobs we hope to complete during the 2025 Work Party days. You can also download the full details of all the tasks (PDF 600kB) at the bottom of this page. The list will also be available on the day in the Bosuns Hut. We hope that by circulating to members prior to the work parties, members can volunteer for specific jobs via mark.dunne@huntssc.org.uk but also bring with them the right tools, clothing and PPE for that job; materials are provided.

Summary of jobs

  1. Chipping large pile of branches (instead of burning)
  2. Using orange trailer/ tractor - collect up the cut branches from the roadway and move them to the shredding pile.
  3. Trailers & chippings - Extend trailer storage area
  4. Land between the top gates: Clear self-seeded saplings, Remove Ivy, Cut ivy stem, Cut stumps low to the ground allowing for mower use.
  5. Land in front of sign: Cut lower branches to allow for ground plants to thrive. Move branches to the shredding pile
  6. Land in front of sign: Cut back tree stumps to allow mower to operate
  7. Wash club sign
  8. Fence by first gate: repair fence rail which was broken by car crashing into it!
  9. Clear vegetation from drainage ditch banks
  10. Make a chain ground anchor and padlock the middle gate back
  11. Clean out post box and then fix loop inside for spare gate padlock
  12. Lake bank general vegetation clearance
  13. NW bank: Pollard trees that are in the water along the whole bank, make stacked habitat piles along the bank.
  14. Habitat pile: Tidy up, cut back vegetation growing around it
  15. Between the two top gates - Cut the trees/bushes on left to create hedge
  16. Footpath side bank on left - general clearance
  17. Wooden fence line along roadway: Harsh cut back of brambles/ lower tree branches etc
  18. Cut back reds on the driveway area
  19. Cut back reeds between the launch and Bosuns hut slipway
  20. Green gate - paint
  21. Remove remaining bushes that hinder mower.
  22. Car park rubble: Move to Gabions area
  23. Car Park - Smaller rubble - fill in pot holes using vibrating plate to tamp down
  24. Install Gabions for bank stabilisation from new slipway towards the middle slipway.
  25. Clean and sort out throw out any junk behind bar area
  26. Galley big clean (after lunch)
  27. Using old workshop door and frame -install door underneath race box
  28. Race box
  29. Main pontoon remove old scaffolding
  30. Geese gates: Paint with preservative
  31. Club boats: Power wash/clean and carry out any repairs
  32. Power boats: jet wash then use the elec polisher then apply protective coating.
  33. Deep clean both changing rooms
  34. Committee boat floor panels
  35. New bosuns hut dinghy launch area: Finish installing squares and gravel.
  36. PB1 & PB2 epoxy screws on rubbing strip.
  37. Re-paint bosun hut floor
  38. Wash marker buoys
  39. Trailer/Trolley area weeding
  40. Electrical remedial work
  41. Dig Elec cable trench boat park
  42. Elec cable trench by old boatshed
  43. Dig trench for electrics between old workshop and ladies changing room
  44. Weed and power wash patio and paths
  45. Attach cladding onto the side of committee boat shelter
  46. Plate the walkway rather than the current bricks.
  47. Wash UPVC
  48. Paint new rudder
  49. Replace broken Honda lawnmower wheels
  50. Finish club boat move
  51. Move tree stumps into car park
  52. Make up new mooring ropes